Dopad "Just-in-Sequence" dodávek na širší dodavatelský řetězec

DSpace Repository

Language: English čeština 

Dopad "Just-in-Sequence" dodávek na širší dodavatelský řetězec

Show simple item record

dc.contributor.advisor Dani, Samir
dc.contributor.author Rakovan, Peter
dc.date.accessioned 2015-07-24T12:26:26Z
dc.date.available 2015-07-24T12:26:26Z
dc.date.issued 2015-02-16
dc.identifier Elektronický archiv Knihovny UTB
dc.identifier.uri http://hdl.handle.net/10563/31072
dc.description.abstract Automobilový priemysel prešiel za posledné desaťročia mnohými zmenami. Od roku 2000 sa kustomizácia stala kľúčovou konkurenčnou výhodou. Aby sa výrobcovia vedeli vysporiadať s vysokou variabilitou kustomizovanej výroby, museli začať využívať takzvanú "mass customization". Modulárna produkcia sa ukázala ako správny nástroj pre vysporiadanie sa s vysokou variabilitou výroby pri zachovaní nízkych nákladov spojených s masovou výrobou. Pre podporu modulárnej výroby začali výrobcovia implementovať sekvenčné dodávky. Jedná sa o formu dodávok, pri ktorej je potrebná minimálna úroveň vlastných zásob pri sekvenčnej výrobe. Táto práca dopĺňa už získané informácie k tejto problematike. Ďalšou otázkou, ktorou sa práca zaoberá, je dopad sekvenčných dodávok na dodávateľský reťazec. Za pomoci mapy hodnotového toku meria dopad sekvenčných dodávok na úroveň zásob, organizáciu produkcie a časov dodávok u výrobcu, dodávateľa prvého a dodávateľa druhého stupňa.
dc.format 81 s. (114 714 znakov)
dc.format.extent 2548172
dc.language.iso en
dc.publisher Univerzita Tomáše Bati ve Zlíně
dc.rights Bez omezení
dc.subject JIT cs
dc.subject JIS cs
dc.subject modulárna produkcia cs
dc.subject automobilový priemysel cs
dc.subject úroveň zásob cs
dc.subject sekvenčné dodávky cs
dc.subject sekvenčná výroba cs
dc.subject JIT en
dc.subject JIS en
dc.subject Modular Production en
dc.subject Automotive Industry en
dc.subject Inventory Level en
dc.subject Sequenced Supply en
dc.subject Sequenced Production en
dc.title Dopad "Just-in-Sequence" dodávek na širší dodavatelský řetězec
dc.title.alternative The impact of just-in-sequence supply to the wider supply chain
dc.type diplomová práce cs
dc.contributor.referee Chromjaková, Felicita
dc.date.accepted 2015-05-19
dc.description.abstract-translated Automotive industry has gone through many changes over the last decades. In the 2000s customization has become a key competitive advantage. To cope with large complexity of customized production while keeping the cost low, manufacturers started to seek for so called mass customization. Modular production has been proven to be able to deal with a customized production while utilize on the aspects of the lean manufacturing. To enhance the above mentioned changes towards the customized production, manufacturers started to implement just-in-sequence. Just-in-sequence is a stockless form of supply based on just-in-time philosophy. It enables stockless supply to sequenced productions, which just-in-time could not deal with. Just-in-sequence deliveries are synchronized with the sequence of the assembly line. This report intends to enlarge already gained practical knowledge in this field. Another question is whether this form of deliveries required by car manufacturers has an impact on the wider supply chain. This report is therefore taking a larger picture of a supply chain. Using value stream mapping, impacts of just-in-sequence on inventory levels, organization of production and cycle times could be analysed in an original equipment manufacturer (OEM), tier 1 supplier and tier 2 supplier.
dc.description.department Ústav průmyslového inženýrství a informačních systémů
dc.thesis.degree-discipline Průmyslové inženýrství cs
dc.thesis.degree-discipline Industrial Engineering en
dc.thesis.degree-grantor Univerzita Tomáše Bati ve Zlíně. Fakulta managementu a ekonomiky cs
dc.thesis.degree-grantor Tomas Bata University in Zlín. Faculty of Management and Economics en
dc.thesis.degree-name Ing.
dc.thesis.degree-program Systémové inženýrství a informatika cs
dc.thesis.degree-program System Engineering and Informatics en
dc.identifier.stag 41083
utb.result.grade B
dc.date.submitted 2015-04-27


Files in this item

Files Size Format View Description
rakovan_2015_dp.pdf 2.430Mb PDF View/Open None
rakovan_2015_op.docx 23.04Kb Unknown View/Open None
rakovan_2015_vp.pdf 1021.Kb PDF View/Open None

This item appears in the following Collection(s)

Show simple item record

Find fulltext

Search DSpace


Browse

My Account